When does a second supplier give a buyer a second source?
Two vendors can fill their orders with material from the same producer. The benefit of splitting the order depends on how much independent supply can reach the buyer before stock runs out.
Assessment dated 27 November 2026
A retailer that divides its carton order between two printers has some protection if one printing press breaks down. It may still depend on a single paper mill for most of its board. The distinction matters when a tariff or a shortage affects the material both printers buy. For the carton it actually uses, the buyer needs to know how much board comes from the mill and when an alternative could deliver enough to cover a shortage.
How much can the other mill deliver in time?
Suppose the common mill stops delivering for four weeks. The retailer has 1,000 finished cartons in stock. The independent mill keeps supplying board for 200 cartons a week. Starting in week three, it can supply material for another 300 finished cartons per week, after testing and delivery. Assume the printers have agreed to convert that volume, the quantities arrive within each week and demand stays at 1,000 cartons per week.
- Week one. The retailer receives 200 cartons and draws 800 from stock to fill the order. It has 200 left in storage.
- Week two. The 200 incoming cartons and 200 remaining in stock fill 400 orders. The retailer is short 600.
- Weeks three and four. The alternative supplies 500 cartons each week. With stock exhausted, the retailer misses another 500 orders in each week.
Together, the printers deliver 1,400 new cartons during the interruption. Adding the 1,000 initially in stock leaves 1,600 orders unfilled by their due dates. If the extra 300 per week were available from week one, the four-week shortfall would shrink by 600. If the first mill resumed after one week, stock would cover the whole interruption. All three outcomes start with the same 80% upstream concentration.
A supplier's installed capacity can overstate what a buyer will receive. Hours already sold to other customers, board that has yet to pass the buyer's tests and the time to deliver finished cartons all affect the feasible date and quantity. A useful comparison between quotes is how many approved cartons each can commit to this customer in weeks one, two and three. An inventory buffer and a reservation for extra production cover different parts of that calendar.
What national trade figures can reveal
The OECD uses inter-country input-output tables to estimate how much foreign production an industry draws on, directly and through its suppliers. A domestic converter or a foreign assembler can both use imported materials. A record of purchases from that converter or assembler captures only the immediate transaction. The OECD's estimates add the production required at earlier stages.1
Richard Baldwin, Rebecca Freeman and Angelos Theodorakopoulos applied that approach to US manufacturing in 2018. For the vehicle sector they put China's share of all manufactured inputs at 5.1% after tracing indirect supplies, about four times the share indicated by direct purchases. The denominator includes US inputs. The estimate describes purchases in value terms across a sector. To judge whether an individual vehicle can leave the factory on schedule, a buyer still needs the quantities, compatibility and lead times of its particular components.2
What manufacturers could replace after the Japanese earthquake
The 2011 earthquake in Japan gave researchers a way to observe an interruption and how suppliers and customers adjusted to it. Three studies looked at different groups of firms and different stages of recovery.
| Firms observed | What researchers found | What it says about sourcing |
|---|---|---|
| Japanese firms linked through suppliers and customers | Carvalho and colleagues traced the shock in both directions. Sales effects reached firms connected indirectly to businesses in the disaster area.3 | A buyer outside the affected area can face a shortage even when its own immediate suppliers operate elsewhere. |
| US affiliates of Japanese multinationals | Boehm, Flaaen and Pandalai-Nayar found that their US output measure fell roughly in step with imported inputs in the months after the earthquake, relative to other multinationals. The authors used exports to nearby North American markets as a proxy for US production.4 | These affiliates had limited scope to replace inputs quickly. A small cost share can sustain a much larger amount of finished output. |
| Japanese buyers outside the disaster area, tracked over 12 years | Kawakubo and Suzuki compared buyers with and without pre-existing suppliers in the affected area. On average, the exposed group added suppliers outside the area. The researchers detected no differential harm across several firm performance measures.5 | Relationships can change over time. Purchasing records from before a disruption may overstate continuing exposure after firms have found alternatives. |
For a sourcing decision, those findings make the duration of the interruption as important as the supplier count. The carton calculation measures units tied to a mill and orders at risk conditional on a four-week stoppage. Estimating an expected annual loss would also require the likelihood and duration of interruptions, the margin lost or delay cost per order, and whether customers will accept later delivery. An 80% input share supplies none of those probabilities.3 4 5
Method and limits
- The carton volumes, material prices, qualification time and available capacity are hypothetical. Each carton uses a single unit of board. The example excludes further upstream overlap between the two mills and assumes other inputs and conversion services remain available.
- Exposure is measured in required physical units. A higher price changes purchasing expenditure even if the physical allocation stays the same. Unfilled orders are measured at their due dates. They could become delayed sales or cancellations.
- The national evidence uses input-output estimates for broad industries. The earthquake studies describe specific firms and a particular event. Their estimates do not set a switching time or outage probability for the hypothetical buyer.1 2 3 4 5
Sources for this page
- Gross output flows in global value chains
OECD · Dataset consulted 27 November 2026 - Hidden Exposure: Measuring US Supply Chain Reliance
Brookings Papers on Economic Activity, Richard Baldwin, Rebecca Freeman and Angelos Theodorakopoulos · Fall 2023 - Supply Chain Disruptions: Evidence from the Great East Japan Earthquake
Quarterly Journal of Economics, Vasco M. Carvalho, Makoto Nirei, Yukiko U. Saito and Alireza Tahbaz-Salehi · May 2021 - Input Linkages and the Transmission of Shocks: Firm-Level Evidence from the 2011 Tōhoku Earthquake
Federal Reserve Board, Christoph Boehm, Aaron Flaaen and Nitya Pandalai-Nayar · October 2015 - How Do Firms Respond to Supply Chain Disruptions? Evidence from the Great East Japan Earthquake
Research Institute of Economy, Trade and Industry, Takafumi Kawakubo and Takafumi Suzuki · July 2024